← Workspace·drmax-validation-day-zero

Dr. Max — Day 0 (current reality)

Elevation install · GroupWide · multi-market
Elevation
Engagement timeline·Day 84 / 180
P0 · Pre-sale
Engagement read
P1 · Configure
L0 setup · BDN
P2 · Authority
Decision rights
P3 · Operate
Pilots & scale
P4 · Exit
Certification
Live obstacle profile/ engine evaluation18 of 19 evaluated

8 active obstacles, 2 latent

Top obstacles below. Each shows the conditions firing. Click to drill into recovery actions.

10 patterns requiring attention · 19 obstacles modeled total
Highest-leverage next move
Pre-stage CEO briefing before M0
1meeting
O-013 · Sponsor Escalation Stalled · 3/3 conditions met
Confirm commercial framing with External ChampionAR
Identify Penta operating partnerAR
!30-min CEO briefing scheduledAR
M0 Configuration session (CEO present)AR
Engagement value at risk · aggregate impact of 8 active obstacles
partial: 7 of 8 obstacles have impact data
Cumulative delay
34–84 wk
if all unresolved
Illustrative € at risk
€1.5M–€4.8M
across 6 obstacles
Critical / large VaR
5
of 8 active
Top dimensions
schedule · scope
5 citations
What to do — top 5 prescribed actionsrule-based · derived from current state · click any item to drill into source
1
7 high-severity obstacles firing — engagement risk profile is elevated
When 5+ HIGH-severity obstacles fire concurrently, the engagement is structurally fragile. Consider whether this is the right week to commit to M0, or whether to invest 1–2 weeks in pre-mitigation.
evidence: 7 obstacles with severity=high are currently active
This week
AR + Michalopen →
2
Pre-stage 30-min CEO briefing before M0
Sponsor is not actively driving (Board state = Aware). M0 will not get the air cover it needs unless the CEO arrives pre-aligned on what is at stake.
evidence: L0.board_state = Aware · O-013 (Sponsor Escalation Stalled) is active
Before M0blocks: O-013
ARopen →
3
Stand up L3-329 (AI conformity assessment process) within 30 days
EU AI Act pressure is Months_3_to_6 and the conformity assessment process is not yet stood up. The legal exposure window is closing; this is a hard deadline, not a soft target.
evidence: L0.ai_act_deadline_pressure = Months_3_to_6 · L3-329 state = not_stood_up · O-022 (AI Act Compliance Stalled) is active
Next 30 daysblocks: O-022
CIO + GCopen →
4
Negotiate 3 authorities during M0
3 L1 authorities are currently Out and are gating active obstacles. These are the actual horse-trade items for the M0 conversation.
evidence: Authorities to negotiate: L1-108, L1-129, L1-113
Before M0blocks: O-001, O-003, O-008 +5
AR + Sponsoropen →
5
Charter cross-market sync forum (L3-326)
Multi-market engagement with no cross-market sync mechanism. Markets will diverge (different vendors, different decision cadences) within the first quarter unless the sync is stood up early.
evidence: L0.multi_market = true · L3-326 state = not_stood_up · O-014 (Multi-Market Parity Drift) is active
Next 30 daysblocks: O-014
IALopen →
Outside-in benchmark · Elevation · week 12 (M3)Behind typicalmethodology prior · replace with empirical curves once N>1 engagements complete
M3: Mid-engagement steady state. Most authorities granted, mechanisms operational.
L1 authorities grantedBehind typical
0vs expected 1828 (target 24)
L3 mechanisms stood upBehind typical
0vs expected 1022 (target 16)
Peers named + activeBehind typical
2vs expected 610 (target 8)
Constraint breaches
  • Active obstacles: 8 (max for this milestone: 3)
  • High-severity active: 7 (max for this milestone: 1)
Configuration coverage

Authorities (L1)

0 of 32 granted
Critical (Must)0
Optional (Nice)0
Out / not granted32
Open authorities

Mechanisms (L3)

0 of 30 stood up
Stood up0
Not stood up30
Open mechanisms

Peer interfaces

2 of 12 active
Named + active2
Named, inactive5
Unnamed5
Open peers
Engagement state synced · live engine evaluationmethodology v0.2.1 · engine v0.2